Changing the Project Contact
Code Insight provides the ability to change the Project Contact for a given project. The Project Contact, initially the project creator, is the default contact for all task-workflow notifications generated during the inventory review process. That is, if a Legal, Security, or Developer contact has not been explicitly assigned to the project through system Project Defaults or at the project-settings level, that contact defaults to the Project Contact. Additionally, the Project Contact is the default contact for any “miscellaneous” tasks created during an inventory review.
The current Project Contact, a Project Administrator, or a System Administrator can transfer the Project Contact role to different user. That user automatically inherits the roles the previous Project Contact user held.
Changing a Project Contact is a silent transaction. No email notifications will be sent as part of this operation.
To change the Project Contact, do the following:
- Log into Code Insight as the current Project Contact, a Project Administrator, or System Administrator.
- Navigate to the Summary tab (see Opening the Project Summary Tab).
- Select Change Project Contact from the
Manage Projectmenu, or click the Change Project Contact button, whichever is available. The Select New Project Contact dialog appears.-
If you have not logged with the appropriate permissions, neither the menu option nor the button will be visible.
-
- Select a name in the list and click Apply . The Summary tab shows the selected name displayed in the Project Contact field.